Skip to product information
1 of 1

Meta Biomed Absorbent Paper Points Special Taper 35/04 60 Point

Meta Biomed Absorbent Paper Points Special Taper 35/04 60 Point

Meta Biomed absorbent paper points special taper 35/04

Meta Biomed Absorbent Paper Points Special Taper 35/04 are endodontic consumables designed for effective drying and moisture control of root canals prepared with a 4% taper. Matched to size 35/.04 canal preparations, these paper points support efficient moisture removal prior to obturation within routine rotary endodontic workflows.

Clinical Advantages

  • Special taper design matched to 0.04 canal preparations
  • High absorbency for efficient removal of irrigants and residual moisture
  • Consistent sizing for predictable adaptation to prepared canals

Indications & Clinical Use

  • Drying of root canals prepared with size 35/.04 instruments
  • Moisture control prior to obturation
  • Routine use during rotary endodontic procedures

Material, Technology & Performance

  • Medical-grade absorbent paper material
  • ISO size: 35
  • Taper: 0.04

Clinical Workflow & Handling

  • Selected according to final file size and taper
  • Inserted to working length for moisture absorption
  • Replaced as needed until the canal is adequately dry

Instructions for Use

  1. Complete canal irrigation and shaping.
  2. Select Meta Biomed paper point size 35/.04.
  3. Insert into the canal to working length.
  4. Remove and repeat with new points until dry.

Packaging & Specifications

  • Absorbent paper points – special taper
  • Size: 35
  • Taper: 0.04
  • Quantity: 60 points per box

Manufacturing & Market Authority

Meta Biomed Absorbent Paper Points are suitable for use in dental clinics across Egypt (A.R.E) and the MENA region, supporting standardized endodontic moisture control workflows aligned with rotary preparation systems.

Regular price 125.00 EGP
Regular price Sale price 125.00 EGP
Sale Sold out
Taxes included. Shipping calculated at checkout.
Quantity
View full details
Fast Delivery
Arrives between 08 Mar – 09 Mar
(3–4 Business Days)